IDENTIFICATION OF BARRIERS TO THE DEVELOPMENT OF HYDRO POWER IN UTTARAKHAND.
- Uttarakhand Power Corporation Limited, Dehradun, Uttarakhand ? 248001.
- University of Petroleum and Energy Studies, Dehradun, Uttarakhand ? 248007.
30 Downloads
184 Views
Abstract
Uttarakhand is endowed with perennial rivers and large network of both rain fed and ice fed rivers that provide immense scope for development of Hydro Power in the State. Hydro power is the clean energy which generates electricity at zero fuel cost. Regulatory issues, Transmission /Power evacuation issues, Environmental concerns, Inter-state perspectives, Law and order issues, Dearth of good contractors, Natural effects, Political issues, Land acquisition problem, Resettlement and Rehabilitation issues, Locational disadvantages, Budgetary requirements, Private sector involvement and Longer gestation period are some of the obstructions which are hindering the development of hydro power plants. This paper reviews the available literature to identify several barriers affecting the development of Hydro Power in Uttarakhand.
Keywords
Article Analytics
References
- Aiyar, ?Twenty-Five Years of Indian Economic Reform,? Policy Anal. CATO Inst., no. 803, pp. 1?24, 2016.
- PwC, ?Future of India - The Winning Leap,? Leap, pp. 1?148, 2014.
- Trading Economics, ?India {GDP} Growth Rate,? pp. 1?9, 2011.
- D. Bank, Meeting the Low-Carbon Growth Challenge OUTLOOK 2016 UPDATE OUTLOOK 2016. 2016.
- Bergasse, The Relationship between Energy and Socio-Economic Development in the Southern and Eastern Mediterranean. 2013.
- Sen and S. Ganguly, ?Opportunities, barriers and issues with renewable energy development ? A discussion,? Renew. Sustain. Energy Rev., vol. 69, no. May, pp. 1170?1181, 2017.
- Conference, ?Presidential address delivered by the author at the Gujarat Economic Association?s 31 Annual Conference held at Idar in August 2001. *,? no. August, 2001.
- Central Electricity Authority, ?All India Installed Capacity of Power Stations,? Power, Gov. India, vol. I, no. 5, pp. 1?7, 2016.
- Ali and A. Semwal, ?Renewable energy in India: Historical developments and prospects,? Int. J. Appl. Eng. Res., vol. 9, no. 10 SPEC. ISSUE, pp. 1169?1183, 2014.
- S. Block, ?Renewable Energy and Green Growth in India For more information,? 2468.
- Planning Commission, ?Report of The Working Group on Power for Twelfth Plan ( 2012-17 ),? Comm. India Website, no. 12, p. 466, 2012.
- International Hydropower Association, ?Hydropower and the World ??TM s Energy Future Technologies and Programmes /,? Notes, no. November, p. 4, 2000.
- S. Kaunda, C. Z. Kimambo, and T. K. Nielsen, ?Hydropower in the Context of Sustainable Energy Supply: A Review of Technologies and Challenges,? ISRN Renew. Energy, vol. 2012, pp. 1?15, 2012.
- Perlman, ?Advantages of Hydroelectric Power Production and Usage,? U.S. Dep. Inter. | U.S. Geol. Surv., pp. 1?3, 2016.
- K. Sovacool, S. Dhakal, O. Gippner, and M. J. Bambawale, ?Halting hydro: A review of the socio-technical barriers to hydroelectric power plants in Nepal,? Energy, vol. 36, no. 5, pp. 3468?3476, 2011.
- Bhoi and D. S. M. Ali, ?Potential of Hydro Power Plant in India and its Impact on Environment,? Int. J. Eng. Trends Technol., vol. 10, no. 3, pp. 114?119, 2014.
- Tshering and B. Tamang, ?Hydropower - key to sustainable, socio-economic development of Bhutan,? United Nations Symp. Hydropower Sustain. Dev., pp. 27?29, 2004.
- Locher and A. Scanlon, ?Sustainable Hydropower-Issues and Approaches,? pp. 1?23, 2012.
- M. Madan, ?The hydropower development in India?challenges and way forward,? Mind an Eng., pp. 441?442, 2015.
- M. Madan, ?The Hydro Power Development in India- Challenges and Way Forward,? no. May 2015, pp. 1?49, 2015.
- Shrestha, Arun. B.; Kumar, Rajesh; Shen, ?An Overview of Glaciers, Glacier Retreat, and Subsequent Impacts in Nepal, India and China,? p. 70, 2005.
- Sivakumar, D. Das, N. P. Padhy, A. R. Senthil Kumar, and N. Bisoyi, ?Status of pumped hydro-storage schemes and its future in India,? Renew. Sustain. Energy Rev., vol. 19, pp. 208?213, 2013.
- S. K. Naidu, ?Small hydro in India : environment friendly alternative energy source,? vol. 1, no. December, pp. 81?93, 1996.
- O. Jaber, ?Prospects and challenges of small hydropower development in Jordan,? Jordan J. Mech. Ind. Eng., vol. 6, no. 2, pp. 110?118, 2012.
- Brown, ?World Energy Resources: Hydropower,? p. 810, 2016.
- IRENA & ETSAP, ?Hydropower Technology Brief,? no. February, pp. 1?18, 2015.
- Purohit, ?Small hydro power projects under clean development mechanism in India: A preliminary assessment,? Energy Policy, vol. 36, no. 6, pp. 2000?2015, 2008.
- Back et al., ?Hydropower Potential in India,? pp. 5?7, 2016.
- Report, ?Preliminary Ranking Study of Hydro Electric Schemes Page 1 Preliminary Ranking Study of Hydro Electric Schemes,? no. February, pp. 1?7, 2002.
- K. Sharma, P. K. Tiwari, and Y. R. Sood, ?A comprehensive analysis of strategies, policies and development of hydropower in India: Special emphasis on small hydro power,? Renew. Sustain. Energy Rev., vol. 18, pp. 460?470, 2013.
- Baidya, ?Development of Small Hydro,? Himal. Small Hydropower Summit, pp. 34?43, 2006.
- L. de Araujo, L. P. Rosa, and N. F. da Silva, ?Hydroelectricity,? Gener. Electr. a Carbon-Constrained World, pp. 323?344, 2010.
- Oprea, ?the Hydropower 1 . Hydroelectric Power,? 2000.
- Roy, ?Hydropower in Uttarakhand: Is ?development? the real objective?,? Econ. Polit. Wkly., vol. 43, no. October 11, pp. 19?22, 2008.
- Sharma, ?Hydro Power Vs Thermal Power : A Comparative Cost-Benefit Analysis Need and Importance of Hydroelectric Power,? Int. J. Arts Sci., vol. 3, no. 9, pp. 125?143, 2010.
- O. Chairman and C. E. E. Lectricity, ?H Ydropower in the N Orth E Ast : P Otential and H Arnessing S Trategy,? no. 6, 2006.
- P. Rahi and A. K. Chandel, ?Refurbishment and uprating of hydro power plants - A literature review,? Renew. Sustain. Energy Rev., vol. 48, pp. 726?737, 2015.
- Basins, ?Hydropower Development,? Assess. Cumul. impact Hydropower Proj. Alaknanda Bhagirathi basin, 2011.
- Gonzalez, A. Kilinc, and N. Weidmann, ?Renewable Energy Development Hydropower in Norway,? Cent. Appl. Int. Financ. ?, 2011.
- Khurana and A. Kumar, ?Small Hydro Power- A review,? Int. J. Therm. Technol., vol. 1, no. 1, pp. 107?110, 2011.
- Saxena and A. Kumar, ?Hydropower Development in India,? Ighem-2010, pp. 1?6, 2010.
- and A. P. Ramanathan, ?Hydropower Development In India,? 2007.
- Here, F. O. R. Index, P. I. N. Layout, O. F. Npn, and F. O. R. Electronics, ?Click Here for Index Page,? Search, pp. 4?5, 2010.
- Wikipedia, ?percent of global hydropower in 2010. China,? pp. 1?15, 2014.
- Rehman, L. M. Al-Hadhrami, and M. M. Alam, ?Pumped hydro energy storage system: A technological review,? Renew. Sustain. Energy Rev., vol. 44, pp. 586?598, 2015.
- Khan, ?Small Hydro Power in India: Is it a sustainable business?,? Appl. Energy, vol. 152, pp. 207?216, 2015.
- ?Hydroelectric Power and Dams- ? ‐ A look at the Environmental , S ocial and Economic,?
- kumar and S. K. Singal, ?Operation and Maintenance Problems in Hydro Turbine Material in Small Hydro Power Plant,? Mater. Today Proc., vol. 2, no. 4?5, pp. 2323?2331, 2015.
- Handique and A. Dutta, ?Power and North East: The Hydro Power Scenario of North East,? Int. J. Sci. Res., vol. 3, no. 12, 2014.
- D. D. Eisenhower, ?Eport of,? no. November, 2000.
- K. Sharma and N. S. Thakur, ?Resource potential and development of small hydro power projects in Jammu and Kashmir in the western Himalayan region: India,? Renew. Sustain. Energy Rev., vol. 52, pp. 1354?1368, 2015.
- S. Chandel, R. Shrivastva, V. Sharma, and P. Ramasamy, ?Overview of the initiatives in renewable energy sector under the national action plan on climate change in India,? Renew. Sustain. Energy Rev., vol. 54, pp. 866?873, 2016.
- Kumar and S. S. Katoch, ?Small hydropower development in western Himalayas: Strategy for?faster implementation,? Renew. Energy, vol. 77, pp. 571?578, 2015.
- C. Joshi, ?Hydro Power Potential in Uttarakhand,? Int. Conf. Small Hydropower - Hydro Sri Lanka, no. October, pp. 22?24, 2007.
- Pranab Kr. Das, ?North ?East, ?The Power House of India?: Prospects and Problems\n,? IOSR J. Humanit. Soc. Sci., vol. 18, no. 3, pp. 36?48, 2013.
- MNRE, ?Statewise Aggregate Capacity of Shp Projects,? p. 1, 2014.
- Place and A. Products, ?Power Scenario Of Uttarakhand,? pp. 1?2, 2017.
- Cea, ?Load Generation Load Generation Balance Balance Report 2015-16,? Electr. Auth., pp. 1?4, 2015.
- Yaqoot, P. Diwan, and T. C. Kandpal, ?Review of barriers to the dissemination of decentralized renewable energy systems,? Renew. Sustain. Energy Rev., vol. 58, pp. 477?490, 2016.
- P. Painuly, ?Barriers to renewable energy penetration: A framework for analysis,? Renew. Energy, vol. 24, no. 1, pp. 73?89, 2001.
- Luthra, S. Kumar, D. Garg, and A. Haleem, ?Barriers to renewable/sustainable energy technologies adoption: Indian perspective,? Renew. Sustain. Energy Rev., vol. 41, pp. 762?776, 2015.
- K. Mishra, N. Khare, and A. B. Agrawal, ?Small hydro power in India: Current status and future perspectives,? Renew. Sustain. Energy Rev., vol. 51, pp. 101?115, 2015.
- International Hydropower Association, ?Hydropower Status Report 2016,? pp. 1?41, 2016.
- Balmer and D. Spreng, ?Hydroelectric Power,? Fuel, pp. 193?209, 2012.
- Singh, ?Green Growth and Transport in India,? p. 37, 2015.
- Nautiyal, S. K. Singal, Varun, and A. Sharma, ?Small hydropower for sustainable energy development in India,? Renew. Sustain. Energy Rev., vol. 15, no. 4, pp. 2021?2027, 2011.
- S. Subrahmanyam, ?Status of Electric power generation in India with special emphasis on Hydropower expansion,? Int J Renew Energ Env. Eng, vol. 1, no. 1, pp. 31?33, 2013.
- GOI, ?Faster , Sustainable and More Inclusive Growth - An Approach to Twelfth Five Year Plan,? Comm. Gov. India, p. 146, 2011.
- ?HYDRO POWER POTENTIAL DEVELOPMENT IN INDIA,? pp. 1?27.
- E. House, ?Hydropower Policy , 2008,? vol. 41, no. 0, 2008.
- Government of India, ?Draft National Electricity Plan,? vol. 1, no. Volume 1, 2016.
- S. V. Singh, ?Distribution generation scenario in Indian context: An review,? vol. 2, no. 7, pp. 29?33, 2015.
- US department of the Interior Bureau of Reclamation Power Resources office, ?Reclamation: managing water for the west,? Power, p. 2, 2005.
- Palit, ?Renewable energy in Northeast India: issues and prospects,? Energy Technol. Sustain. Dev., no. November, 2003.
- [75] M. Madan, ?Hydropower Project Development in India : Issues and Way Forward,? pp. 1?4, 2017.
- [76] K. Sharma and N. S. Thakur, ?Analyze the Factors Effecting the Development of Hydro Power Projects in Hydro Rich Regions of India,? Perspect. Sci., vol. 8, pp. 4?6, 2016.
- GEI, ?Global Electricity Initiative 2014,? Electr. Initiat. Rep., p. 54, 2014.
- D. Alley, R. Hile, and C. Mitra, ?Visualizing hydropower across the himalayas: Mapping in a time of regulatory decline,? Himalaya, vol. 34, no. 2, pp. 52?66, 2014.
- NITI Aayog, ?Draft National Energy Policy-India,? NITI Aayog, Gov. India, pp. 1?106, 2017.
- Development, P. Sector, T. H. E. State, and O. F. Uttaranchal, ?Policy on Hydropower Development By Private Sector in the State of Uttaranchal,? pp. 1?8.
- Tortajada, ?Policy dimensions of development and financing of water infrastructure: The cases of China and India,? Environ. Sci. Policy, vol. 64, pp. 177?187, 2016.
- J. Bishop et al., New Pathways for Hydropower : Getting Hydropower Built ? What Does It Take ?, no. January. 2015.
- Hodgkinson and A. Wilson, ?Effective Allocation of Excavation Risk in Hydropower Projects.?
- Kristinsdottir, ?Risks and decision making in development of new power plant projects,? p. 245, 2012.
- I. H?ffken, ?A closer look at small hydropower projects in India: Social acceptability of two storage-based projects in Karnataka,? Renew. Sustain. Energy Rev., vol. 34, pp. 155?166, 2014.
- Verma, D. Negandhi, a. K. Wahal, and R. Kumar, ?Revision of rates of NPV applicable for different class/category of forests,? no. November, p. 143, 2013.
- ?11/18/2017 Untitled Page,? p. 2017, 2017.
How to Cite This Article
B.C.K. Mishra, Atri Nautiyal, Dayanand Pandey, Anil Kumar, H.S.S. Santosh Kumar and Mohammed Yaqoot. (2017); IDENTIFICATION OF BARRIERS TO THE DEVELOPMENT OF HYDRO POWER IN UTTARAKHAND., Int. J. of Adv. Res., 5 (12), 1842-1851, ISSN 2320-5407. DOI: https://doi.org/10.21474/IJAR01/6153
Corresponding Author
This work is licensed under a Creative Commons Attribution 4.0 International License.