Vol. 10 (11) pp. 1299-1305 DOI: 10.21474/IJAR01/15794

SOFTWARE PROJECT SCHEDULINGANALYSIS

  • Informatics Management Study Program.
  • Faculty of Engineering Satya Negara Indonesia University.
15 Downloads 76 Views
Crossref

Abstract

Along with the number of projects received and must be completed on time by PT. EKIOSKU, where project scheduling has been carried out using the estimation method, so that it has an impact on the results of estimating time, human resources, and estimated costs of software projects that are quite large. In addition, for the tasksperformed by the project manager, its still carried out in an inefficient verbal way because each workforce has different abilities. Based on the existing problem conditions, itis necessary to recalculate for project scheduling by using the Function Point and COCOMO methods, it is hoped that it cangive an idealabor needs, processingtime, and project costs required.

Keywords

Article Analytics

How to Cite This Article

Kiki Kusumawati and Sri Aryani (2022); SOFTWARE PROJECT SCHEDULINGANALYSIS, Int. J. of Adv. Res., 10 (11), 1299-1305, ISSN 2320-5407. DOI: https://doi.org/10.21474/IJAR01/15794

Corresponding Author

KIKI KUSMAWATI
UNIVERSITAS SATYA NEGARA INDONESIA
Indonesia