Vol. 14 (11) pp. 309-318

INTEGRATION OF PREDICTIVE ANALYTICS AND QUALITY MANAGEMENT SYSTEMS FOR EARLY DEFECT DETECTION IN OIL AND GAS PIPELINE CONSTRUCTION

0 Downloads 18 Views

Abstract

Construction - stage defects in oil and gas pipelines arise from interactions among material, welding, handling, installation, inspection, and documentation processes. They may remain hidden until commissioning or operation, when correction is substantially more difficult. This integrative review examines how predictive analytics can be embedded within a quality management system rather than deployed as an isolated defect classifier. Evidence from pipeline radiography, ultrasonic examination,welding process monitoring, construction quality prediction, and Quality 4.0 is synthesized using a lifecycle- and decision-oriented lens. The resulting framework links traceable construction records, risk-aware predictions, verification by competent inspectors, and auditable corrective action. Key distinctions concern defect likelihood versus defect severity, test accuracy versus operational utility, and model predictions versus formal acceptance decisions. The literature supports targeted decision assistance but not autonomous certification. Key research needs include prospective multicentre validation, exposure to rare safety-critical defects, uncertainty calibration, and evaluation of prevented rework. The paper offers a practicable architecture for early intervention while retaining engineering accountability.

Keywords

How to Cite This Article

Khurram Shahzad (2026); INTEGRATION OF PREDICTIVE ANALYTICS AND QUALITY MANAGEMENT SYSTEMS FOR EARLY DEFECT DETECTION IN OIL AND GAS PIPELINE CONSTRUCTION, International Journal of Advanced Research (IJAR), 14 (11), 309-318, ISSN 2320-5407.

Corresponding Author

Khurram Shahzad

Saudi Arabia

Article Analytics

Similar Articles