12Sep 2021

A FAST DYNAMIC PROGRAMMING ALGORITHM FOR STOPE BOUNDARY LAYOUT FOR UNDERGROUND MINE

  • Department of Mathematics, Federal University Birnin Kebbi.
Crossref Cited-by Linking logo
  • Abstract
  • Keywords
  • Cite This Article as
  • Corresponding Author

We developed an efficient algorithm that generates optimal stope layout for an underground mine. After a mining site has been identified and an exploration has been done, the data gathered is analysed and a modelling technique is applied to produce an ore body. The ore body is divided into thousands of mining blocks in three dimensions. The blocks are assigned values per tonne. The miners desire a stope layout which maximizes the mine value. In this paper, we present a fast algorithm that generates the stope layout efficiently without violating the physical constraints.


[Sakirudeen A. Abdulsalaam (2021); A FAST DYNAMIC PROGRAMMING ALGORITHM FOR STOPE BOUNDARY LAYOUT FOR UNDERGROUND MINE Int. J. of Adv. Res. 9 (Sep). 86-90] (ISSN 2320-5407). www.journalijar.com


Sakirudeen A. Abdulsalaam
Federal University Birnin Kebbi
Nigeria

DOI:


Article DOI: 10.21474/IJAR01/13378      
DOI URL: http://dx.doi.org/10.21474/IJAR01/13378